Drainage
For base up/globe down or horizontal operation, a small drainage hole will be drilled in the globe,
to permit any water draining through the enclosure to exit harmlessly.
This will normally be done at the factory, but if done on site, YOU MUST USE THE APPROPRIATE
TAPERED DRILL BIT, OBTAINABLE FREE OF CHARGE FROM TEMPEST LIGHTING. A standard drill
bit may crack the plexiglass globe. Tempest Lighting will not be responsible for such damage.
Horizontal Enclosures be sure to replace the globe with the drainage hole at the lowest point
after relamping.
Note: A tapered drill bit is included with all Tornado 1900-1950 shipments. Weep holes must be
drilled on site as part of the installation process.